Old floor removal
Existing flooring, adhesive residue and old fixings are removed and disposed of where agreed.
Subfloor checks, levelling and preparation before new flooring is fitted, on its own or as part of a flooring project.
Most flooring problems trace back to preparation that wasn't checked properly. Dublin Surface Works removes the old covering, checks the exposed base for level, moisture and damage, and carries out the preparation needed before new flooring is fitted.
Existing flooring, adhesive residue and old fixings are removed and disposed of where agreed.
Uneven or damaged areas of the subfloor are levelled or repaired so the new floor has a sound base.
The subfloor is checked for moisture issues that could affect the new flooring, with any additional work explained before it proceeds.
Share the rooms, photographs, current floor, the result you want and your preferred timing.
We measure the rooms and check access, preparation, materials and adjoining floors.
The quote explains the work, materials, price, what is included and anything still to be decided.
We complete the agreed preparation, check the subfloor is ready and hand over, either to our own fitting team or yours.
Share the rooms, existing condition, finish you want and preferred timing so the quotation can be planned clearly.